A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
| dc.creator | Francisco Román Angel Bello Acosta | |
| dc.date | 2011 | |
| dc.date.accessioned | 2018-10-18T22:08:19Z | |
| dc.date.available | 2018-10-18T22:08:19Z | |
| dc.description | In this paper we study a problem of sequencing jobs in a machine with programmed preventive maintenance and sequence-dependent setup times. To the authors' knowledge, this problem has not been treated as such in the operations research literature. Computational experiments show that it is very hard to solve the problem by exact methods. Therefore, the contribution of this paper is to design and implement a solution approach based on metaheuristic procedures. The proposed method finds high quality solutions in very short computational times. © 2010 Elsevier Ltd. All rights reserved. | |
| dc.identifier.doi | 10.1016/j.camwa.2010.12.028 | |
| dc.identifier.endpage | 808 | |
| dc.identifier.issn | 8981221 | |
| dc.identifier.issue | 4 | |
| dc.identifier.startpage | 797 | |
| dc.identifier.uri | http://hdl.handle.net/11285/630551 | |
| dc.identifier.volume | 61 | |
| dc.language | eng | |
| dc.relation | https://www.scopus.com/inward/record.uri?eid=2-s2.0-79651469503&doi=10.1016%2fj.camwa.2010.12.028&partnerID=40&md5=76f609f335135ca82fa7a29fc00ac3ff | |
| dc.relation | Investigadores | |
| dc.relation | Estudiantes | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0 | |
| dc.source | Computers and Mathematics with Applications | |
| dc.subject | Computational experiment | |
| dc.subject | Computational time | |
| dc.subject | Exact methods | |
| dc.subject | Heuristic approach | |
| dc.subject | High-quality solutions | |
| dc.subject | Metaheuristic | |
| dc.subject | Metaheuristics | |
| dc.subject | Periodic maintenance | |
| dc.subject | Scheduling problem | |
| dc.subject | Sequence-dependent setup | |
| dc.subject | Sequence-dependent setup time | |
| dc.subject | Single machine scheduling | |
| dc.subject | Solution approach | |
| dc.subject | Heuristic algorithms | |
| dc.subject | Heuristic methods | |
| dc.subject | Machinery | |
| dc.subject | Problem solving | |
| dc.subject | Scheduling | |
| dc.subject | Preventive maintenance | |
| dc.subject.classification | 7 INGENIERÍA Y TECNOLOGÍA | |
| dc.title | A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times | |
| dc.type | Artículo | |
| refterms.dateFOA | 2018-10-18T22:08:19Z |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- 79651469503.pdf
- Size:
- 94.46 KB
- Format:
- Adobe Portable Document Format
- Description:
- Artículo

